Transportation & Infrastructure Template

Tunnel / Underground Daily Report Template

245+ fields across 14+ sections. OSHA 1926 Subpart S, MSHA (if mining), NFPA 502 compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Tunnel / Underground

Construction Daily Report — 5 industry sections + 8 common sections

0
Total Fields
61
Industry Fields
98
Common Fields
44
KPI Mapped
OSHA 1926 Subpart SMSHA (if mining)NFPA 502ACI 318
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Tunnel / Underground — Industry Sections (61 fields)

Field NameTypeUnitRequiredPOD KPI
TBM Face StationTextSTARequired
TBM Advance (today)NumberLFRequiredCostPerInstallUnit
TBM Advance — Rings InstalledIntegerringsRequiredCostPerInstallUnit
Ring WidthNumberinchesRequired
TBM Thrust ForceNumbertonsRequired
TBM TorqueNumberft-lbsRequired
TBM RPMNumberrpmRequired
Cutter Head InterventionsIntegercountRequired
Cutter ChangesIntegercuttersRequired
Grout (annular/tail void)NumberCYRequired
Grout PressureNumberPSIRequired
Muck VolumeNumberCYRequired
Muck — Disposal MethodEnumTruck/Conveyor/Slurry/RailRequired
Downtime — HoursNumberhrsRequired
Downtime — CauseEnumMechanical/Ground/Maintenance/UtilitiesRequired
Field NameTypeUnitRequiredPOD KPI
Excavation RoundIntegerroundsRequiredCostPerInstallUnit
Round LengthNumberftRequired
Excavation AreaNumberSFRequired
Ground Class EncounteredEnumClass I/II/III/IV/V/VIRequired
Shotcrete Applied — InitialNumberCYRequired
Shotcrete ThicknessNumberinchesRequired
Lattice Girder / Steel SetIntegersetsRequired
Rock Bolts InstalledIntegerboltsRequiredCostPerInstallUnit
Rock Bolt — LengthNumberftRequired
Rock Bolt — Pull TestEnumN/T / Pass / FailRequiredInspectionFirstPassRate
Spiling / Pipe CanopyIntegerpipesRequired (if needed)
Bench ExcavationNumberCYRequired (if multi-bench)
Invert Excavation & ClosureNumberLFRequired
Field NameTypeUnitRequiredPOD KPI
Convergence Monitoring — Points ReadIntegerpointsRequired
Convergence — Max MovementNumbermmRequiredInspectionFirstPassRate
Inclinometer ReadingIntegerpointsRequired (if installed)
Settlement Monitoring — SurfaceIntegerpointsRequired
Settlement — Max MovementNumbermmRequired
Groundwater InflowNumberGPMRequired
Probe Drilling Ahead of FaceNumberLFRequired (if specified)
Face Mapping / Geological LogBooleanY/NRequired
Ground Condition vs PredictedEnumAs Expected / Better / WorseRequired
Trigger Level ExceedanceBooleanY/NRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026