Transportation & Infrastructure Template

Highway / Heavy Civil Daily Report Template

250+ fields across 15+ sections. FHWA, AASHTO, MUTCD compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Highway / Heavy Civil

Construction Daily Report — 8 industry sections + 8 common sections

0
Total Fields
111
Industry Fields
98
Common Fields
48
KPI Mapped
FHWAAASHTOMUTCDOSHA 1926 Subpart PState DOT
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Highway / Heavy Civil — Industry Sections (111 fields)

Field NameTypeUnitRequiredPOD KPI
Cut VolumeNumberCYRequiredCostPerInstallUnit
Fill VolumeNumberCYRequiredCostPerInstallUnit
Net Cut/Fill BalanceNumberCYRequired
Haul DistanceNumbermilesBest Practice
Truck Loads HauledIntegerloadsRequired
Subgrade PreparationNumberSYRequired
Proof Roll - AreaNumberSYRequired (DOT)
Proof Roll - ResultEnumPass/Fail/ReworkRequiredInspectionFirstPassRate
Geotextile / Geogrid PlacedNumberSYRequired (if designed)
Unsuitable Material RemovedNumberCYRequired (if encountered)
Embankment Lifts PlacedIntegerliftsRequired
Lift ThicknessNumberinchesRequired (DOT spec)
Moisture Content TestNumber%Required
Moisture - Optimum TargetNumber%Required
Compaction Test - Nuclear GaugeNumber% ProctorRequired (DOT)InspectionFirstPassRate
Compaction Test - Location (STA)TextRequired
Slope Grading CompletedNumberLFBest Practice
Field NameTypeUnitRequiredPOD KPI
Aggregate Base PlacedNumbertonsRequiredCostPerInstallUnit
Aggregate Type / GradationTextRequired (DOT spec)
Base Thickness (design)NumberinchesRequired
Base Thickness (measured)NumberinchesRequired
Compaction Test - BaseNumber% ProctorRequired (DOT)InspectionFirstPassRate
Moisture ConditioningEnumDry/Optimum/WetRequired
Lime / Cement StabilizationNumbertonsRequired (if designed)
Stabilization RateNumberlbs/SYRequired (if designed)
Priming / Tack Coat AppliedNumberSYRequired
Prime Material / RateTextgal/SYRequired
Field NameTypeUnitRequiredPOD KPI
Mix Type / Design #TextRequired (DOT)
Binder Grade (PG)TextPG gradeRequired (DOT)
Asphalt Tons PlacedNumbertonsRequiredCostPerInstallUnit
Mat Thickness (design)NumberinchesRequired
Mat Thickness (measured)NumberinchesRequired
Lane / LiftTextRequired
Station Range PavedTextSTA to STARequired
Paver Make / ModelTextBest Practice
Paver SpeedNumberft/minBest Practice
Roller Pattern (breakdown/intermediate/finish)TextRequired (DOT)
Mat Temperature (behind screed)Number°FRequired (DOT)
Mat Temperature (at breakdown roller)Number°FRequired
Air Temperature (at paving)Number°FRequired (DOT)
Ground Temperature (surface)Number°FRequired (DOT)
Wind SpeedNumbermphRequired (DOT)WeatherRecoveryRate
Nuclear Density Tests - CountIntegertestsRequired (DOT)
Nuclear Density - Location (STA)TextRequired
Nuclear Density - % GmmNumber%Required (DOT)InspectionFirstPassRate
Nuclear Density - Pass/FailEnumPass/FailRequired
Core Samples TakenIntegercoresRequired (DOT)
Joint Construction (longitudinal)EnumCold/Hot/WedgeRequired
Joint DensityNumber% GmmRequired (DOT)
Tack Coat AppliedNumberSYRequired
Tack RateNumbergal/SYRequired
Milling CompletedNumberSYRequired (if applicable)
Milling DepthNumberinchesRequired (if applicable)
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026