Energy & Power Template

Solar Thermal / CSP Daily Report Template

200+ fields across 12+ sections. OSHA 1926, ASME BPVC, NFPA compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Solar Thermal / CSP

Construction Daily Report — 2 industry sections + 8 common sections

0
Total Fields
21
Industry Fields
98
Common Fields
40
KPI Mapped
OSHA 1926ASME BPVCNFPAState Energy Permits
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Solar Thermal / CSP — Industry Sections (21 fields)

Field NameTypeUnitRequiredPOD KPI
Mirror / Reflector InstalledIntegerassembliesRequiredCostPerInstallUnit
Mirror TypeEnumParabolic Trough/Heliostat/FresnelRequired
Mirror — Tracking SystemIntegerdrives installedRequired
Receiver Tube Installed (trough)NumberLFRequired (if trough)CostPerInstallUnit
Heliostat Foundation (tower)Integerpiles/padsRequired (if tower)
Heliostat — Assembled & AlignedIntegerunitsRequired (if tower)CostPerInstallUnit
Solar Tower — ConcreteNumberCYRequired (if tower)
Solar Tower — Height (today)NumberftRequired (if tower)
Central Receiver — SetEnumN/S / In Progress / CompleteRequired (if tower)
HTF Piping (heat transfer fluid)NumberLFRequiredCostPerInstallUnit
HTF MaterialEnumSynthetic Oil/Molten Salt/SteamRequired
HTF Piping — Weld/TestIntegerweldsRequiredInspectionFirstPassRate
Field NameTypeUnitRequiredPOD KPI
Steam Turbine — SetEnumN/S / Set / AlignedRequiredCostPerInstallUnit
Generator — SetEnumN/S / Set / AlignedRequired
Condenser — SetEnumN/S / ConnectedRequired
Cooling TowerEnumN/S / Structure / TestingRequired
Boiler/Steam GeneratorEnumN/S / Installed / TestedRequired
Thermal Storage Tank (molten salt)EnumN/S / Erected / Insulated / TestedRequired (if TES)CostPerInstallUnit
TES — Salt ChargeNumbertonsRequired (if TES)
Step-Up TransformerEnumN/S / Installed / TestedRequired
Grid InterconnectionEnumN/S / In Progress / EnergizedRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026