Onshore Wind Template

Every Wind Farm Activity.
One Daily Report.

250+ structured fields across 20 sections. From civil roads to turbine commissioning. Based on real Goose Harbour Lake and Mersey River Wind Farm PODs. Maps to 50+ POD KPIs.

0+
Structured Fields
0
Report Sections
0+
KPI Matches
IEC 0
IEC Standard

Template Structure

Every section designed for onshore wind construction, with field counts based on real project data

20 Sections, 250+ Fields

Project Header
20+
Weather Delay Tracking
8
Deliveries
15+
Civil / Roads
15+
Foundations
20+
Overhead Line (OHL)
18+
Underground Electrical
12+
Substation
15+
Turbine Erection
12+
Grounding
10+
O&M Building
8
Manpower
20+
Equipment
12+
Safety / HSE
18+
Environmental
15+
Quality
12+
Issues / Delays / Impacts
12+
Photos
10+
Schedule Tracking
12+
Commissioning
15+

Based on real daily reports from Goose Harbour Lake Wind (42 turbines, Nova Scotia) and Mersey River Wind Farm (30 turbines, Nova Scotia). Every field maps to a POD KPI for automated trend tracking.

How POD Works for Wind

1

Speak Your Report

60-second voice input captures turbine erection status, OHL progress, foundation pours, environmental observations, and crew counts.

2

AI Maps 250+ Fields

POD auto-populates foundation logs, OHL trackers, commissioning checklists, and environmental compliance forms. Zero manual data entry.

3

50+ KPIs Update Instantly

Turbine erection progress, OHL completion, foundation metrics, and environmental compliance appear on real-time dashboards automatically.

What Makes This Different

Not a generic template with “wind” in the title. Built from 700+ real wind farm daily reports.

Pole-by-structure tracking

Track every pole number, haul status, set date, framing, conductor pull, clip, and sag individually. Not just counts — per-structure progress.

Weather delay categorization

Precipitation, wind speed, lightning proximity, and temperature extremes tracked as separate delay categories with hours lost per type.

Species at risk compliance

SARA/SOCI compliance, wildlife sweep logs, species observations, rain gauge readings, and flora ID built into the template — not an afterthought.

Voltage-level commissioning

35kV collection, 138kV transmission, and 230kV interconnection tracked separately. Each voltage level has its own testing, energization, and sign-off fields.

5-day rolling view

Yesterday actual, today plan, plus a 3-day lookahead forecast. Every section shows not just what happened, but what comes next.

See the Template in Action

How POD visualizes turbine erection data from your daily report

Per-Turbine Tracking

Turbine Erection Progress

Foundation0%Tower Base0%Tower Mid0%Tower Top0%Nacelle0%Hub0%Blades0%Commissioned0%

Each turbine is tracked through 8 erection stages. POD auto-calculates cumulative progress and flags turbines that fall behind the critical path sequence.

Section Deep Dive

Expand each section to see the detailed field breakdown

From Fields to KPIs, Automatically

Every field in the template maps to POD KPIs using AI fuzzy matching. No manual configuration.

Auto-Mapped

Template Fields to POD KPIs

Foundation pour CY/day
CostPerInstallUnit
OHL poles set vs planned
ActivityStartReliability
Weather delay hours
WeatherRecoveryRate
Turbines erected cumulative
EarnedScheduleTracker
Near misses reported
NearMissVelocity
Species at risk observations
EnvironmentalIncidents
Equipment idle vs active hours
IdleVsActiveHeatmap
Subcontractor headcount/hours
SubcontractorReliability
50+
Auto-Mapped KPIs
250+
Data Fields
99%
AI Fuzzy Match
0
Manual Entry

Download the Wind Farm Template

Get the complete 250+ field template as an Excel file. Or try POD and let AI fill it for you from a 60-second voice report.

Live Demo

Every KPI From a 5-Minute Voice Report

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Schedule vs Budget

Schedule & Budget Performance

SPI 0.00CPI 0.00
25%50%75%100%$0$755K$1.5M$2.3M$3.0MJanFebMarAprMayJun
Planned Progress
Actual Progress
Planned Spend
Actual Spend
SPI0.00
CPI0.00
Sched Var+0.0%
Cost Var+0.0%
Schedule 3.0% behind planbudget 1.8% under target
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Modernize Wind Farm Reporting?

See how POD turns 250+ fields into a 5-minute voice report with instant KPI dashboards.

Last updated: March 2026