Residential Template

Senior Living / Care Daily Report Template

200+ fields across 12+ sections. FGI Guidelines, ADA, Life Safety Code compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Senior Living / Care

Construction Daily Report — 3 industry sections + 8 common sections

0
Total Fields
23
Industry Fields
98
Common Fields
36
KPI Mapped
FGI GuidelinesADALife Safety CodeState Licensing
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Senior Living / Care — Industry Sections (23 fields)

Field NameTypeUnitRequiredPOD KPI
Units FramedIntegerunitsRequiredCostPerInstallUnit
Units — MEP RoughIntegerunitsRequired
Units — Finish CompleteIntegerunitsRequiredCostPerInstallUnit
ADA-Compliant UnitIntegerunitsRequired (FHA/ADA)InspectionFirstPassRate
Grab Bar / BlockingIntegerlocationsRequired
Emergency Call System (pull cord/pendant)Integerunits wiredRequired
Walk-In Shower (curbless)IntegerunitsRequired
Memory Care — Secure Entry/ExitIntegerdoorsRequired (memory care)
Wander Management SystemEnumN/A / Installed / TestedRequired (memory care)
Field NameTypeUnitRequiredPOD KPI
Dining Room / KitchenEnumN/S / In Progress / CompleteRequired
Commercial Kitchen EquipmentIntegerpiecesRequired
Nurse StationIntegerstationsRequired (AL/SNF)
Med Room / PharmacyIntegerroomsRequired
Therapy / Rehab RoomEnumN/A / In Progress / CompleteRequired (SNF)
Salon / SpaEnumN/A / In Progress / CompleteBest Practice
Activity / Community RoomEnumN/S / In Progress / CompleteRequired
Chapel / Meditation RoomEnumN/A / In Progress / CompleteBest Practice
Field NameTypeUnitRequiredPOD KPI
Fire Sprinkler (NFPA 13)NumberLFRequiredCostPerInstallUnit
Fire Alarm — Notification (visual/audible)IntegerdevicesRequired (NFPA 72)
Smoke Compartment WallNumberLFRequired (NFPA 101)
Emergency GeneratorEnumN/S / Installed / TestedRequired (NFPA 99/110)
Generator — Essential Power TestEnumN/T / Pass / FailRequiredInspectionFirstPassRate
Elevator (ADA, stretcher-size)IntegerunitsRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026