Residential Template

Multi-Family / Apartment Daily Report Template

210+ fields across 13+ sections. IBC, ADA/Fair Housing, NFPA 13R compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Multi-Family / Apartment

Construction Daily Report — 6 industry sections + 8 common sections

0
Total Fields
59
Industry Fields
98
Common Fields
38
KPI Mapped
IBCADA/Fair HousingNFPA 13REnergy Code
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Multi-Family / Apartment — Industry Sections (59 fields)

Field NameTypeUnitRequiredPOD KPI
Foundation ConcreteNumberCYRequiredCostPerInstallUnit
Structural Concrete (podium/post-tension)NumberCYRequiredCostPerInstallUnit
PT Tendons StressedIntegertendonsRequired (if PT)
Structural SteelNumbertonsRequired (if steel)
Wood Framing — FloorsNumberSFRequired (Type V)CostPerInstallUnit
Wood Framing — WallsNumberLFRequired
SheathingNumberSFRequired
Floor / Level CompletedTextlevel #Required
Building # / PhaseTextRequired
Units Framed (complete)IntegerunitsRequiredCostPerInstallUnit
Field NameTypeUnitRequiredPOD KPI
Exterior Sheathing / WRBNumberSFRequired
Exterior Finish (siding/stucco/brick)NumberSFRequiredCostPerInstallUnit
Window InstalledIntegercountRequired
Sliding Door InstalledIntegercountRequired
RoofingNumberSFRequired
Waterproofing — Deck/BalconyNumberSFRequired
Flashing & SealantNumberLFRequired
Field NameTypeUnitRequiredPOD KPI
Plumbing — DWV RoughNumberLFRequiredCostPerInstallUnit
Plumbing — Water SupplyNumberLFRequired
Plumbing — GasNumberLFRequired
HVAC — Units per unit (PTAC/Mini-Split/Ducted)IntegerunitsRequiredCostPerInstallUnit
HVAC — DuctworkNumberLFRequired
Electrical — Rough WireNumberLFRequired
Electrical — Panel per unitIntegerpanelsRequired
Fire Sprinkler PipingNumberLFRequired (NFPA 13/13R)CostPerInstallUnit
Sprinkler HeadsIntegercountRequired
Fire Alarm — DevicesIntegercountRequired (NFPA 72)
Standpipe / FDCIntegercountRequired (IBC)
Low-Voltage (data/cable/intercom)NumberLFRequired
Elevator InstallationEnumN/S / Shaft / Car / TestingRequired (if 4+ stories)
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026