Nuclear (SMR) Daily Report Template

280+ fields across 14+ sections. NRC 10 CFR 50/52, ASME III, IEEE 603 compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Nuclear (SMR)

Construction Daily Report — 6 industry sections + 8 common sections

0
Total Fields
85
Industry Fields
98
Common Fields
48
KPI Mapped
NRC 10 CFR 50/52ASME IIIIEEE 603ANSI N45.2NQA-1
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Nuclear (SMR) — Industry Sections (85 fields)

Field NameTypeUnitRequiredPOD KPI
Safety-Related Concrete PlacedNumberCYRequired (ACI 349)CostPerInstallUnit
Concrete Mix Design # (NQA-1 qualified)TextRequired
Concrete TemperatureNumber°FRequired (ACI 349)
Concrete SlumpNumberinchesRequiredInspectionFirstPassRate
Concrete Air ContentNumber%Required
Cylinders Cast (safety-related)IntegercountRequired (ACI 349)
Rebar Placed (safety-related)NumbertonsRequired
Rebar — Splice Inspection (cadweld/mechanical)IntegersplicesRequired (NRC)InspectionFirstPassRate
Splice Inspection - Pass/FailEnumPass/FailRequired
Formwork InstalledNumberSFRequired
Structural Steel (safety-related)NumbertonsRequired
Embedment Plates InstalledIntegercountRequired
Embedment Location Tolerance VerifiedBooleanY/NRequired (ITAAC)
Basemat Pour — VolumeNumberCYRequired
Basemat Pour — ContinuousBooleanY/NRequired (if mass pour)
Containment Liner Plate InstalledNumberSFRequired
Containment Liner - Weld InspectionIntegerwelds inspectedRequired (ASME III)
Module Set (prefab module placement)IntegermodulesRequired (SMR-specific)CostPerInstallUnit
Module WeightNumbertonsRequired
Module — Fit-Up VerificationEnumPass/FailRequired (ITAAC)InspectionFirstPassRate
Field NameTypeUnitRequiredPOD KPI
Safety ClassEnumClass 1 / Class 2 / Class 3Required (ASME III)
Pipe Material / SpecificationTextRequired (ASME III)
Pipe SizeTextNPSRequired
Pipe LF InstalledNumberLFRequiredCostPerInstallUnit
Weld CountIntegerweldsRequired (ASME III)
Weld # (per NDE map)TextRequired
Welder ID / StampTextRequired (ASME III)
Weld ProcessEnumGTAW/SMAW/GMAWRequired
Weld — Visual InspectionEnumAccept/RejectRequiredInspectionFirstPassRate
Weld — RT (Radiography)EnumAccept/Reject/N/ARequired (Class 1: 100%)
Weld — UT (Ultrasonic)EnumAccept/Reject/N/ARequired (per code)
Weld — PT (Dye Penetrant)EnumAccept/Reject/N/ARequired (per code)
Weld — MT (Magnetic Particle)EnumAccept/Reject/N/ARequired (per code)
Weld Reject RateNumber%RequiredReworkVelocity
Hydrostatic Test — SystemTextRequired (ASME III)
Hydrostatic Test — PressureNumberPSIRequired
Hydrostatic Test — ResultEnumPass/FailRequiredInspectionFirstPassRate
Pipe Support / Hanger InstalledIntegercountRequired
Pipe Support — TypeEnumRigid/Spring/Snubber/StrutRequired
Field NameTypeUnitRequiredPOD KPI
Safety-Related Cable InstalledNumberLFRequiredCostPerInstallUnit
Cable TypeEnumPower/Control/Instrument/FiberRequired
Cable Tray InstalledNumberLFRequired
Cable Separation Verified (Div I/II/III)BooleanY/NRequired (NRC/IEEE 384)InspectionFirstPassRate
Motor Control Center (safety)IntegerunitsRequired
Switchgear (safety)IntegerunitsRequired
Emergency Diesel Generator FoundationEnumN/S / In Progress / CompleteRequired
EDG — Set in PlaceBooleanY/NRequired
Battery Room — Rack InstalledIntegerracksRequired
Battery — Class 1EIntegercells installedRequired
Instrument Tubing InstalledNumberLFRequired
Instrument CalibrationIntegerinstrumentsRequiredInspectionFirstPassRate
Control Room Panel / ConsoleEnumN/S / In Progress / CompleteRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026