Your Energy Project Is Missing
200+ Daily Report Fields
Solar, wind, and BESS projects require 200-300+ daily report fields for NEC, NFPA, and OSHA compliance. Most EPCs track fewer than 40.
Compliance Coverage: POD vs Industry Average
Across 6 energy standards, POD templates cover 82-97% of required fields. The industry average? Under 20%.
Standard-by-Standard Breakdown
Green bars show POD template field coverage. Red bars show the typical daily report.
The Documentation Gaps Putting You at Risk
NEC 690 requires per-string electrical testing documentation
Solar projects must document string-level IV curve testing, ground fault readings, and insulation resistance. Most daily reports lack these fields entirely.
NFPA 855 thermal monitoring goes untracked
BESS projects must document cell temperatures, ventilation system status, and gas detection readings daily. A single missed entry can void compliance.
Turbine torque specs are not in your daily log
Wind construction requires bolt torque verification at every elevation. Foundation anchors, tower sections, blade bolts — each with specific torque values that must be recorded daily.
Commissioning data lives in separate spreadsheets
Inverter testing, transformer energization, relay calibration — critical commissioning data gets captured in ad-hoc spreadsheets that never connect to your daily report.
How POD Templates Solve This
13 industry-specific templates for energy
Solar PV, Wind Onshore/Offshore, BESS, Geothermal, Hydro, Nuclear SMR, Solar Thermal, Biomass, Hydrogen, Power Transmission, Substation, and Solar+BESS Combined.
Every NEC, NFPA, and OSHA field built in
Regulatory-specific fields are pre-built and flagged. NEC 690 string testing, NFPA 855 thermal monitoring, OSHA 1926 safety — nothing missing.
Maps to 45-55 POD KPIs per industry
Every field connects to POD analytics. Upload a completed template and your dashboard populates with production curves, safety trends, and schedule metrics.
5 role variants per template
GC/EPC gets 200-300 fields, Owner gets 40-60, Subcontractor gets 50-80, Safety gets 60-80, Foreman gets 30-50. Every role gets exactly what they need.
“We were using a 30-field Excel sheet for a 500MW solar project. POD's template has 223 fields and we realized how much data we were missing.”
— Project Director, Top 10 Solar EPC
Every KPI From a 5-Minute Voice Report
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Schedule & Budget Performance
Momentum Score
PODThese update in real time from a 5-minute voice report. No spreadsheets. No data entry.