Commercial & Institutional Template

Data Center (Standard) Daily Report Template

119+ fields across 9+ sections. NFPA 75/76, ASHRAE TC 9.9, Uptime Tier Standard compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Data Center (Standard)

Construction Daily Report — 7 industry sections + 8 common sections

0
Total Fields
97
Industry Fields
98
Common Fields
35
KPI Mapped
NFPA 75/76ASHRAE TC 9.9Uptime Tier StandardNEC
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Data Center (Standard) — Industry Sections (97 fields)

Field NameTypeUnitRequiredPOD KPI
Raised Floor - Pedestals InstalledIntegercountRequired
Raised Floor - Stringers InstalledIntegercountRequired
Raised Floor - Tiles InstalledNumberSFRequiredCostPerInstallUnit
Raised Floor - HeightNumberinchesRequired
Raised Floor - TypeEnumPerforated/Solid/Cable CutoutRequired
Slab Sealing / Vapor BarrierNumberSFRequired
Column InstallationIntegercountBest Practice
Roof Penetrations SealedIntegercountRequired
Loading Dock / Equipment CorridorEnumN/S / In Progress / CompleteBest Practice
Overhead Containment (Hot/Cold Aisle)NumberLFBest Practice
Field NameTypeUnitRequiredPOD KPI
Main Switchgear InstalledIntegerunitsRequired
Main Switchgear RatingNumberkV / ARequired
Generator Set - InstalledIntegerunitsRequired
Generator RatingNumberkW / MWRequired
Generator Load TestEnumNot Tested / In Progress / Pass / FailRequired
Generator Fuel TankNumbergal (capacity)Required
ATS (Automatic Transfer Switch) InstalledIntegerunitsRequired (Tier III+)
ATS Transfer TestEnumNot Tested / Pass / FailRequired
ATS Transfer TimeNumbermsRequired
UPS InstalledIntegerunitsRequired
UPS RatingNumberkVARequired
UPS Battery TypeEnumVRLA/Li-Ion/FlywheelRequired
UPS Battery Cabinet InstalledIntegercabinetsRequired
UPS Autonomy TestedNumberminRequired
PDU (Power Distribution Unit) InstalledIntegerunitsRequired
PDU RatingNumberkWRequired
RPP (Remote Power Panel) InstalledIntegerpanelsRequired
Busway InstalledNumberLFRequired
Busway RatingNumberARequired
Electrical Panelboard InstalledIntegerpanelsBest Practice
Branch Circuit WiringIntegercircuitsRequired
Power Whips to RackIntegerwhipsRequired
Grounding / BondingEnumNot Started / In Progress / CompleteRequired (NEC)
Field NameTypeUnitRequiredPOD KPI
CRAC Units InstalledIntegerunitsRequired
CRAC Tonnage (per unit)NumbertonsRequired
CRAH Units InstalledIntegerunitsRequired
Chiller InstalledIntegerunitsRequired
Chiller CapacityNumbertonsRequired
Cooling Tower InstalledIntegerunitsRequired
Cooling Tower CapacityNumbertonsRequired
Chilled Water PipingNumberLFRequired
Chilled Water Pipe SizeTextinchesRequired
Glycol ChargeNumbergalRequired
Glycol ConcentrationNumber%Required
Condensate Drain PipingNumberLFBest Practice
HVAC Controls / BMS PointsIntegerpointsBest Practice
Cooling Commissioning StatusEnumNot Started / Balancing / Tested / CompleteRequired
Supply Air TempNumber°FRequired (ASHRAE)
Return Air TempNumber°FRequired (ASHRAE)
Delta-T (supply/return)Number°FRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026