Commercial & Institutional Template

Retail / Shopping Center Daily Report Template

185+ fields across 10+ sections. IBC, ADA, Local Zoning compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Retail / Shopping Center

Construction Daily Report — 3 industry sections + 8 common sections

0
Total Fields
25
Industry Fields
98
Common Fields
35
KPI Mapped
IBCADALocal ZoningNFPA
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Retail / Shopping Center — Industry Sections (25 fields)

Field NameTypeUnitRequiredPOD KPI
Tilt-Up / Masonry WallNumberSFRequiredCostPerInstallUnit
Storefront / Glazing SystemNumberSFRequiredCostPerInstallUnit
Entry Door / VestibuleIntegercountRequired
SOG — Flatness (FF/FL)TextFF#/FL#RequiredInspectionFirstPassRate
Loading DockIntegerdoorsRequired
Canopy / AwningNumberSFBest Practice
Signage Fascia / Pylon FoundationIntegercountRequired
Field NameTypeUnitRequiredPOD KPI
Partition WallNumberLFRequiredCostPerInstallUnit
Sales Floor Finish (tile/polished concrete)NumberSFRequired
Backroom / StockroomNumberSFRequired
Point-of-Sale InfrastructureIntegerstationsRequired
Walk-In Cooler/Freezer (grocery)IntegerunitsRequired (if grocery)
Refrigerated Display Case (grocery)IntegerunitsRequired (if grocery)
Kitchen Exhaust Hood (food service)IntegerhoodsRequired (if food)
Grease TrapIntegercountRequired (if food)
ADA — Accessible RouteEnumPass/FailRequired (ADA)InspectionFirstPassRate
Field NameTypeUnitRequiredPOD KPI
Parking Lot PavingNumberSYRequiredCostPerInstallUnit
Curb / GutterNumberLFRequired
Striping / ADA StallsIntegerstallsRequired (ADA)
Cart CorralIntegercountRequired (if retail)
Drive-Through Lane (if applicable)NumberLFRequired
Monument / Pylon Sign FoundationIntegercountRequired
LandscapingNumberSFRequired
Stormwater DetentionEnumN/S / In Progress / CompleteRequired
Site LightingIntegerpolesRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026