Highway 101 Expansion — Phase 2
CPI has been below 1.0 for the past several days. At 0.92, the project is trending 8.3% over budget.
Review cost categories for root cause. Labor and materials typically drive 70% of cost variance.
CPI at 0.92 projects a $4.4M overrun. 69.2% spent at 73.5% completion.
Monitor labor costs closely — typically the largest variance driver.
Overtime at 12.9% vs. 10% target. At 1.5x rate, excess overtime costs ~$3K/day above baseline.
Add crews for high-volume activities rather than extending hours.
Rain exceeds 0.1" threshold — outdoor work impacted
Consider pulling indoor tasks forward. Monitor forecast for changes.
Sun: Winds 22+ mph. Work allowed but crane operations and elevated work require extra caution.
Review crane wind limits. Secure loose materials. Brief crews on wind safety.
257 workers on site — near peak loading. Ensure site logistics, parking, and welfare facilities are adequate.
90% confidence3 activities behind schedule. 28 of 45 activities completed (62%).
Review 2-week lookahead. Prioritize activities on or near critical path.
At current pace, project will complete ~144 days late (Day 544 vs. planned Day 400).
Develop formal schedule recovery plan. Evaluate acceleration costs vs. liquidated damages.
Focus areas: recover 3 delayed activities; reduce overtime below 10%; address cost variance. Day 275 target: 75.4% overall completion.