Environmental & Specialty Template

Mining (General) Daily Report Template

240+ fields across 14+ sections. MSHA 30 CFR, EPA NPDES, State Mining Permits compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Mining (General)

Construction Daily Report — 7 industry sections + 8 common sections

0
Total Fields
88
Industry Fields
98
Common Fields
45
KPI Mapped
MSHA 30 CFREPA NPDESState Mining PermitsSMCRA
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Mining (General) — Industry Sections (88 fields)

Field NameTypeUnitRequiredPOD KPI
Overburden RemovedNumberBCYRequiredCostPerInstallUnit
Overburden — Truck LoadsIntegerloadsRequired
Overburden — Haul DistanceNumbermilesRequired
Topsoil Stripped / StockpiledNumberCYRequired (SMCRA)
Bench Cut — VolumeNumberBCYRequired
Bench — HeightNumberftRequired (ground control)
Bench — WidthNumberftRequired
Highwall AngleNumberdegreesRequired (geotechnical)
Drill Pattern — Holes DrilledIntegerholesRequiredCostPerInstallUnit
Drill Hole — DiameterNumberinchesRequired
Drill Hole — DepthNumberftRequired
Blasting — Shots FiredIntegershotsRequired
Blasting — Pounds of ExplosiveNumberlbsRequired (ATF)
Blasting — Vibration (PPV)Numberin/secRequired (monitoring)
Blasting — Air OverpressureNumberdBRequired (monitoring)
Blasting — Fly Rock IncidentsIntegercountRequiredNearMissVelocity
Field NameTypeUnitRequiredPOD KPI
Haul Road ConstructedNumberLFRequiredCostPerInstallUnit
Haul Road WidthNumberftRequired
Haul Road Surface (gravel/compacted)NumbertonsRequired
Road GradeNumber%Required (max 10% loaded)
Berm Height (safety)NumberftRequired (MSHA)InspectionFirstPassRate
Water Truck — Dust SuppressionNumberloads / gallonsRequired
Drainage — Diversion DitchNumberLFRequired
Sediment Pond ConstructionEnumN/A / Excavation / Lined / CompleteRequired (NPDES)
Culvert InstallationIntegercountRequired
Power Line — ConstructionNumberLFRequired
Substation / TransformerIntegercountRequired
Field NameTypeUnitRequiredPOD KPI
Concrete PlacedNumberCYRequiredCostPerInstallUnit
Structure TypeEnumCrusher Foundation/Mill Foundation/Conveyor Bent/Thickener/LoadoutRequired
Rebar PlacedNumbertonsRequired
Anchor Bolt InstallationIntegerboltsRequired
Anchor Bolt — Template VerifiedBooleanY/NRequiredInspectionFirstPassRate
Grout — Equipment PedestalNumberCYRequired
Structural Steel ErectedNumbertonsRequiredCostPerInstallUnit
Conveyor Structure — Bents ErectedIntegerbentsRequired
Conveyor Structure — Stringer/TrussNumberLFRequired
Building — Metal Pre-EngNumberSFRequired (mill, crusher, MCC building)
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026