Oil, Gas & Petrochemical Template

Midstream / Gathering Daily Report Template

220+ fields across 13+ sections. DOT PHMSA, API 1104, ASME B31.8 compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Midstream / Gathering

Construction Daily Report — 5 industry sections + 8 common sections

0
Total Fields
52
Industry Fields
98
Common Fields
40
KPI Mapped
DOT PHMSAAPI 1104ASME B31.8EPAState
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Midstream / Gathering — Industry Sections (52 fields)

Field NameTypeUnitRequiredPOD KPI
ROW ClearingNumberacresRequiredCostPerInstallUnit
Pipe StringingNumberLFRequiredCostPerInstallUnit
Pipe Diameter / WallTextNPS / scheduleRequired
Pipe MaterialEnumCarbon / CRA / HDPERequired
BendingIntegerbendsRequired
Welding — JointsIntegerweldsRequired (API 1104)CostPerInstallUnit
Welding — NDT (RT/UT)IntegerweldsRequired (ASME B31.8)InspectionFirstPassRate
Weld Reject RateNumber%RequiredReworkVelocity
Coating (FBE/3LPE)NumberLFRequired
Coating — Holiday TestIntegertestsRequiredInspectionFirstPassRate
TrenchingNumberLFRequiredCostPerInstallUnit
Lowering-InNumberLFRequired
BackfillNumberLFRequired
Hydrostatic TestEnumN/T / Filling / Hold / Pass / FailRequired (PHMSA)InspectionFirstPassRate
Bore / HDDNumberLFRequired (if crossing)
Pig Launcher/ReceiverIntegerunitsRequired
Field NameTypeUnitRequiredPOD KPI
Station Foundation ConcreteNumberCYRequiredCostPerInstallUnit
Compressor — SetIntegerunitsRequiredCostPerInstallUnit
Compressor — TypeEnumRecip/Centrifugal/ScrewRequired
Compressor — Alignment (laser)EnumN/T / Pass / FailRequiredInspectionFirstPassRate
Compressor — Driver (engine/motor/turbine)EnumN/S / Set / AlignedRequired
Station PipingNumberLFRequired (ASME B31.8)
Station Piping — Weld/TestIntegerweldsRequiredInspectionFirstPassRate
Scrubber / Separator — SetIntegerunitsRequired
Cooler (aerial/shell & tube) — SetIntegerunitsRequired
Building / EnclosureEnumN/S / Erected / CompleteRequired
Blowdown / Vent SystemEnumN/S / Installed / TestedRequired (EPA)
Emissions Control (catalyst/engine)EnumN/S / Installed / TestedRequired (EPA CAA)
Field NameTypeUnitRequiredPOD KPI
Meter Run / Tube — InstalledIntegerrunsRequiredCostPerInstallUnit
Meter TypeEnumOrifice/Ultrasonic/Coriolis/TurbineRequired (API 14.3/AGA)
Meter — CalibrationIntegermetersRequiredInspectionFirstPassRate
Prover Loop (liquid)EnumN/A / Installed / ProvedRequired (if liquid)
SCADA / Flow ComputerIntegerunitsRequired
Chromatograph — InstalledEnumN/S / Installed / CalibratedRequired (gas)
Custody Transfer — VerifiedIntegerstationsRequiredInspectionFirstPassRate
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026