Desalination Plant Daily Report Template

215+ fields across 12+ sections. EPA SDWA, CWA, State Coastal Commission compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Desalination Plant

Construction Daily Report — 5 industry sections + 8 common sections

0
Total Fields
48
Industry Fields
98
Common Fields
40
KPI Mapped
EPA SDWACWAState Coastal CommissionNPDES
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Desalination Plant — Industry Sections (48 fields)

Field NameTypeUnitRequiredPOD KPI
Intake Pipeline — LFNumberLFRequiredCostPerInstallUnit
Intake Pipeline — DiameterTextinchesRequired
Intake Pipeline — MaterialEnumHDPE/GRP/ConcreteRequired
Intake Structure (offshore)EnumN/S / In Progress / CompleteRequired
Intake Screen InstallationIntegerscreensRequired (CWA 316b)
Pre-Treatment Basin ConcreteNumberCYRequiredCostPerInstallUnit
Media Filter InstalledIntegerfiltersRequired
DAF (Dissolved Air Flotation)EnumN/A / Installed / TestedRequired (if applicable)
Cartridge Filter HousingIntegerunitsRequired
Chemical Feed (coagulant/acid/anti-scalant)IntegersystemsRequired
Pre-Treatment PipingNumberLFRequiredCostPerInstallUnit
Field NameTypeUnitRequiredPOD KPI
RO Train FoundationIntegercountRequired
HP Pump InstalledIntegerpumpsRequiredCostPerInstallUnit
HP Pump — RatingNumberHPRequired
Energy Recovery Device (ERD)IntegerunitsRequired
ERD TypeEnumPX/Turbocharger/PeltonRequired
Pressure Vessel Rack InstalledIntegerracksRequiredCostPerInstallUnit
Pressure VesselsIntegercountRequired
RO Membranes LoadedIntegerelementsRequired
HP Piping (SS Duplex/Super Duplex)NumberLFRequiredCostPerInstallUnit
HP Piping — Weld RT/PMIIntegerweldsRequiredInspectionFirstPassRate
Permeate PipingNumberLFRequired
Brine/Concentrate PipingNumberLFRequired
CIP (Clean-in-Place) SystemEnumN/S / Installed / TestedRequired
Field NameTypeUnitRequiredPOD KPI
Remineralization SystemEnumN/S / Installed / TestedRequired
Remineralization — Lime/CO2/CalciteTexttypeRequired
Disinfection — UVIntegerunitsRequired
Disinfection — ChlorinationEnumN/S / Installed / TestedRequired
Product Water TankIntegertanksRequiredCostPerInstallUnit
Tank — CapacityNumberMGRequired
Product Water PipingNumberLFRequired
Transfer / Distribution PumpIntegerpumpsRequired
Water Quality Lab EquipmentEnumN/S / Installed / CalibratedRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry