Industrial & Manufacturing Template

Cold Storage / Refrigeration Daily Report Template

210+ fields across 12+ sections. IIAR, ASHRAE 15, EPA RMP compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Cold Storage / Refrigeration

Construction Daily Report — 3 industry sections + 8 common sections

0
Total Fields
38
Industry Fields
98
Common Fields
38
KPI Mapped
IIARASHRAE 15EPA RMPOSHA PSMNFPA
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Cold Storage / Refrigeration — Industry Sections (38 fields)

Field NameTypeUnitRequiredPOD KPI
Insulated Metal Panels (IMP) InstalledNumberSFRequiredCostPerInstallUnit
Panel ThicknessNumberinchesRequired
Panel R-ValueNumberR/inchRequired
Panel TypeEnumWall/Ceiling/PartitionRequired
Panel Sealant (joint)NumberLFRequired
Vapor Barrier InstalledNumberSFRequired
Floor InsulationNumberSFRequired (below freezer slab)
Floor Insulation TypeEnumEPS/XPS/PolyisoRequired
Heated Floor System (glycol/electric)NumberSFRequired (freeze protection)
Heated Floor — Tubing InstalledNumberLFRequired (if glycol)
Air Door / Strip CurtainIntegercountRequired (dock-to-cooler)
High-Speed DoorIntegercountRequired
Field NameTypeUnitRequiredPOD KPI
Compressor — InstalledIntegerunitsRequiredCostPerInstallUnit
Compressor TypeEnumScrew/ReciprocatingRequired
Compressor CapacityNumberTR (tons refrig.)Required
Condenser — InstalledIntegerunitsRequired
Condenser TypeEnumEvaporative/Air-CooledRequired
Evaporator — InstalledIntegerunitsRequiredCostPerInstallUnit
Evaporator — LocationTextroom/zoneRequired
Refrigerant TypeEnumNH3/CO2/R-448A/R-449ARequired (ASHRAE 15)
Refrigerant ChargeNumberlbsRequired
Refrigerant PipingNumberLFRequiredCostPerInstallUnit
Piping MaterialEnumCarbon Steel (NH3)/Copper/SS (CO2)Required
Piping InsulationNumberLFRequired
Insulation ThicknessNumberinchesRequired
Pressure Vessel — Receiver/AccumulatorIntegercountRequired
PSM Equipment Registration (if NH3 >10,000 lbs)BooleanY/NRequired (OSHA PSM)
Field NameTypeUnitRequiredPOD KPI
PLC / Control Panel InstalledIntegerpanelsRequired
Temperature SensorIntegersensorsRequired
Pressure TransducerIntegersensorsRequired
NH3 Detector InstalledIntegersensorsRequired (IIAR/ASHRAE 15)
NH3 Detector — Alarm TestEnumN/T / Pass / FailRequiredInspectionFirstPassRate
Emergency VentilationEnumN/S / Installed / TestedRequired (ASHRAE 15)
Emergency Shutdown (ESD)EnumN/S / Installed / TestedRequired
SCBA StationsIntegerstationsRequired (if NH3)
Leak Test — PressureNumberPSIRequired
Leak Test — ResultEnumPass/FailRequiredInspectionFirstPassRate
System Evacuation & ChargeEnumN/S / Evacuated / Charged / RunningRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026