Heavy Civil Construction

Move More Earth.
Track Every Yard.

0K+
K CY Tracked
0%
% DOT Compliant
0s
Sec Report Time
0%
% Quantity Accuracy

The Challenge

01

Earthwork quantity tracking nightmares

Cut and fill quantities, borrow pit inventories, and waste site tracking require daily documentation. GPS-based quantity surveys need to reconcile with truck counts and survey data.

02

DOT daily report requirements

State DOTs require standardized daily reports with specific formats, weather documentation, and contractor performance records. Each state has different requirements.

03

Equipment utilization across spread work

Heavy civil operations deploy dozers, excavators, scrapers, and haul trucks across miles of spread work. Tracking utilization and fuel consumption for each unit is critical for cost control.

04

Material testing delays and documentation

Compaction tests, gradation analysis, and concrete break results must be documented and linked to specific placement areas. Delays in test results block subsequent operations.

The POD Advantage

Automated Quantity Tracking

Accurate quantities

Daily earthwork quantities from truck counts, GPS surveys, and field measurements. Cut/fill tracking with borrow pit inventory management and waste site documentation.

DOT Report Templates

DOT-ready reports

Pre-built daily report templates formatted for every state DOT. Weather, manpower, equipment, materials, and work activities documented in the required format.

Equipment GPS Integration

Fleet visibility

Track equipment location, utilization hours, idle time, and fuel consumption. Know which machines are productive and which are costing you money sitting idle.

Lab Result Tracking

Test result tracking

Material testing results linked to specific placement areas and daily reports. Track pending tests, failing results, and retest requirements in one dashboard.

Heavy Civil Features

“Tracking 500,000 cubic yards of earthwork across 3 borrow pits and 6 placement areas required reporting our old spreadsheets could not handle. POD automated our quantity tracking.”

— Project Manager, State Highway Widening Project

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026